Epiphany’s Exterior Remodel Recap


Expenditures were as follows:

  • $79,650.00 paid to Weather Tight Corp.
  • $452.00 paid for storage container
  • $350.00 paid for trash dumpster
  • $250.00 paid for fuel for lift and transportation fees
  • Jeff & Cindy Knepper, owners of Five Star Rental and members of First Evan, donated the use of the lift, saving us $2,050. The $2,050 savings will probably be used to landscape the front of the church.

The work on the exterior of our church and school was necessary. It wasn’t only cosmetic – even though the siding was severely faded and rusting. There was significant damage throughout the siding, fascia and gutters that needed attention.

Moderate damage to the fascia on the west side of the building was discovered, as well as severe damage to the gutter system.  Moderate damage was found over the school entryway as water was beginning to penetrate the building.  Severe damage was discovered on upper gable by the attic windows on the east side of the building where water was beginning to penetrate into the building.

The windows of the north gable were eliminated, as these were actually falling out of the building due to severe rotting.  It was also discovered that water had been penetrating into the lower roof system.

During the course of construction, gutter downspouts were relocated to disperse water away from the building and walkways.  Unfortunately, it has been determined that water being dispersed into front sidewalk area for numerous years has undermined the dirt underneath the front entryway causing this to drop.  This problem will need to be addressed in the near future.

All the storm windows that now cover the stained glass windows are impact resistant. The cost of this was somewhat offset by not using the gutter guard on the school parking lot side. The reason for not using the gutter guards in this area is that it is prone to create icicles in freezing conditions, and we felt this would be a safety issue for our guests and children.

We hope that everyone is pleased with the final results of the refurbishing of the exterior of the church and school.  Any question can be directed to the Building Committee Members:  Scott Martyn, Jim Hermann, Dennis Marzigliano or Pastor Zarling

Respectfully submitted,

The Epiphany Building Committee

Comments

Popular posts from this blog

Justified in Jesus

Water into blood and water into wine

Jesus has prepared a place for you - A funeral sermon for Jim Hermann